TOWN OF LEWISTON BUILDING DEPARTMENT

FEE CHART

 

1.       Residential Buildings

Single Family Dwelling.....$400.

Two-Family Dwellings.....$500.

Multiple Dwellings.....$500. +$100.per unit +$350 Rec.

Alterations/renovations/repairs.....$30. +$2 per $1000 of cost

Additions.....$.25 per sq ft

Residential storage bldg......$20 (200 sq. ft. or less)

Residential storage bldg......$.10 sq. ft. (over 200 sq. ft.)

Above ground pool.....$35

In-ground pool.....$50

Deck.....$35

Fence.....$25

Reroof with 2nd layer.....$30

Strip and roof.....$35

Demolition.....$30 + $100 (GPS utility location)

Generator.....$30

2.       Commercial Buildings

Up to 1,000 sq ft......$250.

Over 1,000 sq ft......$250. + $0.25 sq ft.

Alterations/renovations.....$150. + $2./$1,000 of cost

Repair.....$75

All other commercial.....$50

Generator.....$50

Fence.....$50

Roof.....$100

Pool.....$250

Demolition.....$100 +$100 utility location (GPS)

Truss signage.....$50 In addition to Comm./Ind.

3.       Miscellaneous

Compliance inspection.....$50 (change of occupancy but not bldg. class)

Wood burning stove or fireplaces.....$25

Agriculture buildings....$60 (0-3000 sq ft)

                                      ....$180 (3001-6000 sq ft)

                                     .....$360 (over 6000 sq ft)

Signs.....$35 Temporary (30 days)

         .....$25 Permanent - per face (up to 100 sq ft)

         .....$25 + $.25 per sq ft over 100 sq ft

Sign alteration.....$25 + $.15 sq ft (resurface/relocation/add)

Fire alarm system.....$75

Plumbing.....$30 (1-10 fixtures)

                 .....$50 (11-15 fixtures)

                 .....$75 (over 16 fixtures)

Fuel tank installation

(1,000 gallons & up).....$50 per tank

Cell tower.....$1,500 + eng. fee+$5 per ft over 100 ft

Collocation on tower.....$500 + eng. fee+$5 per ft over 100 ft

Annual tower inspection fee.....$1,000

Commercial vehicle permit.....$50

Certificate of occupancy/Compliance letter.....$35

Zoning compliance letter.....$35

Building permit renewal (12 months).....50% of original permit cost

Sewer compliance inspection.....$75

Water compliance inspection.....$75

STOP WORK ORDER

$100 fee to commence construction again after the stop work order has been addressed.

RE-INSPECTION

$35 fee when inspector is called upon to make an inspection and obvious prerequisites are not completed, resulting in additional inspections.

NO PERMIT OBTAINED OR DELAYED

In the event that work requiring a building permit commenced without having the appropriate permit applied for, secured and obtained, said permit fee will be doubled. Each day is considered a separate violation.

 

Fees schedule approved January 6, 2011

Fee schedule will be effective January 7, 2011

 

Click here for Municipal Review Fee Schedule